The question “What information do you need to give me a quotation?” sounds simple, but the right answer is still clear: For a usable quotation, provide project location, opening schedule, width/height/quantity, operator and handing, frame/profile preference, glass, colour/finish, hardware, screens, performance targets, drawings, delivery terms, installation scope and programme. Mark unknowns so the quote can show assumptions instead of hiding them.
For “What information do you need to give me a quotation?”, the quality of the answer depends on converting informal files or messages into a controlled opening schedule. The quote should identify what is measured, assumed, excluded and still awaiting approval before it can become a manufacturing instruction.
The answer to “What information do you need to give me a quotation?” becomes clearer once these points are written down:
| Check | What to confirm |
|---|---|
| Drawings | Plans, elevations, sections and opening marks |
| Dimensions | Width, height, quantity and measurement status |
| Configuration | Operator, handing, panels and screens |
| Specification | Frame, glass, finish and hardware |
| Project terms | Location, delivery, installation, programme and currency |

The practical link to “What information do you need to give me a quotation?” is the information that must appear on the drawing or quotation. A credible report names the standard and edition, laboratory, client, product, operator type, specimen dimensions, frame and glass description, hardware, test sequence, results, date and report identity. Compare these fields with the offered unit and record any engineering justification for differences.
For this decision, quotation inputs and revision control should be supported by the type of evidence that actually answers it: thermal ratings for energy, air/water/structural tests for envelope behavior, safety documentation for glass, and inspection records for execution. One certificate rarely proves every claim. It is worth checking before deciding “What information do you need to give me a quotation?”.
You do not need a complicated workflow to resolve “What information do you need to give me a quotation?”. Work through the following points in order:
For “What information do you need to give me a quotation?”, a useful place to continue is the 65 Series thermal-break casement window. It gives a concrete product reference for the discussion above. The ForgeWin doors and windows range and ForgeWin’s window-and-door delivery project provide broader product or installation context. Treat them as starting points: the proposed size, glass, hardware, performance and site scope still need project-specific confirmation.

This is where the question “What information do you need to give me a quotation?” becomes a project detail rather than a yes-or-no answer. Wind, panel weight, operation and user loads move through glass, sash or leaf, frame, anchors and substrate. The design must address mullion spans, anchor type, edge distances, packers, movement, deflection and corrosion compatibility. A strong profile cannot compensate for an unsuitable anchor or weak substrate.
In practice, obtain calculations or project-specific confirmation where required and make the opening assumptions visible. Check that test evidence represents the operator type and scale being proposed. quotation inputs and revision control should be evaluated with the building structure and tolerance strategy, not as a standalone product feature. This is especially relevant to “What information do you need to give me a quotation?”.
Start with drawings: plans, elevations, sections and opening marks. For “What information do you need to give me a quotation”, that first fact sets the boundary for the rest of the answer. Then record dimensions and any assumption that still needs a drawing, measurement or supplier confirmation.
Ask the supplier to state configuration and specification, using the exact proposed configuration. The response should name exclusions and the evidence behind material claims. This matters for “What information do you need to give me a quotation” because a verbal yes can hide a different glass, hardware or installation scope.
It is ready for an order after the team can confirm measurements and details and issue a controlled final quotation, with dimensions and responsibilities confirmed. Until then, treat the answer to “What information do you need to give me a quotation” as planning guidance. Keep the accepted drawing, quotation and product reference together so production cannot follow an older assumption.
For “What information do you need to give me a quotation?”, this guide draws on the cited technical references and the linked ForgeWin product or project pages. The conclusion is general guidance for quotation inputs and revision control, not a configuration-specific test report, fixed price or substitute for local code and project engineering.