For an early decision, use the answer below; for an order, convert it into drawings and a written schedule. There is no responsible universal price for a custom kitchen. Cabinet length is only a starting point: tall units, islands, door finish, internal storage, hardware, worktop coordination, delivery and installation can change the total more than a simple per-foot rate suggests.

The detail worth checking is the one that can still cause a variation, access problem or early repair later. Separate base, wall and tall cabinets instead of using one blended length. Ask for the door finish and hardware series by name.
For a Singapore HDB flat, renovation rules can affect the site scope even when cabinets themselves appear straightforward. HDB's published guidance covers kitchen work, wall fixings, waterproofing interfaces and access to building services. Projects elsewhere should use the equivalent local rules rather than copying Singapore requirements.
| Decision | What to put in writing |
|---|---|
| Dimensions | Room survey, cabinet runs, heights, depths and fillers |
| Construction | Carcass material, door finish, edge treatment and back panels |
| Hardware | Exact hinge, runner, lift and accessory series |
| Site scope | Removal, delivery, installation, utilities and making-good |
| Commercial terms | Currency, tax, freight, validity, exclusions and change control |
Any early price is a planning figure until dimensions, specification, logistics and site responsibilities are verified. This is why a sample, drawing and quotation should be read together rather than treated as separate approvals.

ForgeWin can review the room information through its ForgeWin design process and ForgeWin measurement guide, then connect the approved design to ForgeWin production process. The Kitchen & Wardrobe product range provides visual starting points, but the project is manufactured from approved dimensions, materials and hardware—not from the inspiration image alone.
For a quotation, include the room or floor plan, labelled photographs, ceiling height, appliance models, finish direction, destination and installation expectations. That package makes the reply faster and reduces allowances that later become variations. Contact ForgeWin with the project brief when those basics are ready.
Yes. A floor plan, labelled photographs and homeowner measurements are usually enough for an initial layout and budget quote. They are not a safe substitute for final site verification before production, especially around corners, ceilings, services and appliance openings.
Plywood is usually preferred where screw holding, lighter weight and better tolerance of occasional moisture matter. MDF is often chosen for smooth painted or routed doors because its surface is uniform. Neither is waterproof, and grade, thickness, edge sealing and workmanship can reverse a simplistic comparison.
Delivery and installation should never be assumed. A clear quotation states whether design, measurement, cabinets, hardware, worktops, packing, freight, tax, unloading, installation, utility connections, removal and making-good are included or excluded.
Last reviewed: 29 August 2026. Project requirements, local regulations and manufacturer data can change; confirm the current documents for the destination and exact specification.